Thursday, January 5, 2012

Understanding Architectural Drawings

Below I have illustrated plans, sections and elevations of the custom-designed vanity pictured on the left.


Plans
The plan is a bird’s eye view looking down from three feet above the floor. I equate this to looking down at the top of a birthday cake.

Sections
Continuing with the birthday cake theme, a section would be like cutting into the cake and seeing all the layers.
The location of where the sections are cut is shown on the plan with a “cut line” and an arrow indicating where the cut has been made and which way we are looking at the section. 
 
Elevations
The elevation shows us what we would see standing in front of the vanity. The location/point of the view is again noted with a circle and arrow on the plan. Referring back to the birthday cake image, if you are looking at the side of the cake and it is a round cake, the drawing of this would be a rectangle.  Vertical parallel lines are used as shading to show the curve.

Tags
The corresponding numbers in these circles, or "tags," tell us the drawing number and the drawing sheet/page in the set. The number on the top of the line indicates the drawing number on a sheet and the bottom number is the page or sheet number in the set. While these drawings all occur on one sheet, the principle remains the same for a larger set of documents where the drawings are on many sheets ... you match the “tag” numbers.

Monday, April 4, 2011

Understanding the Client - Architect - Contractor Relationship

A successful, efficient project considers the client's needs, well-being, and budget. The Client, The Architect, and the Contractor have very specific and necessary roles:
  • The Client/Owner– has specific goals, expectations and a budget that is in alignment with these goals and expectations.
  • The Architect – must guide the Client, propose reasonable, sustainable design solutions, and provide accurate, detailed drawings. These must meet the Client's requirements as well as applicable building codes and zoning criteria. The finalized construction documents will become the Client’s contract with the Contractor.
  • The Contractor – must be a responsible craftsman with expertise and the experience necessary to manage the trades and to build the project as designed and documented.
As with a three-legged stool, each of the three parties must work together in concert. They must maintain open dialogue and be able to troubleshoot as a team in order to respond to unforeseen issues or client-initiated changes. Limiting or eliminating any of these components will leave the client with a compromised solution.
Ultimately, the Client, or Owner, has two contracts: one is between the Owner and the Architect and the other is between the Owner and the Contractor. The Architect works for the Owner during the Construction Phase to observe that the Construction Documents are  interpreted correctly.  The Architect advocates for the Owner. Beware of the Contractor that does not want an Architect involved. Remember, the Architect works for the Owner to see that the investment in the Contract Documents--also known as Drawings and Specifications--is realized. This "three-legged stool" model also creates checks and balances that have been the successful precedence for many of the projects Clawson Architects has completed.  

Thursday, March 31, 2011

Ten things a GREAT Contractor will Say/Do.

  1. "Joe"  here will be the Superintendent on your job.  He will be here every day at 8am.  Here is my phone number and his phone number should you have any questions or concerns.
  2. Here are the copies of  licenses and insurance certificates for all the people that will be working on your house.
  3. I have prepared a detailed schedule to mitigate delays and manage the team's expectations.
  4. I would like to have weekly Team Meetings to review progress we have made, next steps, and any changes to the scope, budgets, shop drawings created for custom work, and schedules.
  5. Let's refer to the Construction Documents.
  6. Let's ask the Architect what the design intent is before we go changing things.
  7. While it may appear that the Structural Engineer has over-designed this, I am sure they have researched the code and done the calculations to ensure the integrity of your house. I will call the Architect and Engineer to review alternatives that achieve the same goals but may result in a cost savings to you. 
  8. I have prepared an analysis that outlines the associated costs/savings you will incur for the changes discussed. Additionally, I have prepared the Change Orders with the associated costs/savings for the approved scope changes (resulting from unforeseen conditions or client requests) for the Team's review and approval.
  9. I have protected the areas that we are not going to be working in.
  10. I look forward to working together with this Team.
Engaging the Contractor can occur at different times.  The interactions discussed above take part during the Construction Administration/Observation Phase. To learn more about how to work with an Architect and the different phases of a project, visit Clawson Architects web site.